Building New
George Street Academy

We would like to extend our appreciation to all those involved in helping
us in creating this most important facility. 

Although the main training hall has now been completed, there is still the out door training area to do.

We have run out of money and are looking for sponsorship, can you help?


PICTURES TO DATE

slk train1

During January we made a start on clearing the site at the rear of the academy and cleaning some of the bricks from the old walls. Unfortunately due to time restraints we were unable to complete these jobs before the builder (Stuart Morrow) was going to start. Luckily a team of lads from the a resalvage company came in straight away and cleared all the bricks within a few days.

traininghall 2

The builders then started by leveling the site with a bulldozer before marking out the new plot.

hall1web

hall2web

On Monday 5th February trenches were started to be dug out for the new foundations and concrete poured in. Even when the snow came on the Thursday, Stuart and his lads still kept working on through it.

IMG 1045

IMG 1048

IMG 1047

By the Friday of that week these were finished and the block work for the foundations was started. (this was due to the ground level going down hill.)

IMG 1049

IMG 1050


Please contact Sifu Paul Burkinshaw on 07973 421860 or Email This email address is being protected from spambots. You need JavaScript enabled to view it.">paulburkinshaThis email address is being protected from spambots. You need JavaScript enabled to view it.">This email address is being protected from spambots. You need JavaScript enabled to view it.
   

slk train1

slk train2

By Tueday 13th February all the block work for the foundations was finished, and the builders then started laying the blue bricks for the outside foundation wall that would be seen due to the fall away of the ground.

slk train3

slk train4

Thursday 15th February and the builders started to fill the cavities between the block work / blue bricks of the foundations with concrete. Pipes and tubing was then laid for the water and electrical supplies.

slk train5

Friday 16th, and stone was compacted around the foundations and then on the floor area of the building.

   

 

As the stone was laid in around the floor area drainage pipes were laid and connected to the main sewerage man-hole. Once the internal floor area had been built up and compacted with stone, insulation was then laid, then a water-proof membrain and finally the concrete was laid in and leveled. 

THALL-floor1

THALL-floor2

   

hall march1

hall march2

Damp course laid, then internal block work started.

hall march3

 

By Friday 2nd March, much of the internal perimeter block work walls have been set out, giving a rough impression of the size of the new academy.

hall 4 1

hall 4 2(1)

By Thursday 8th March, all block work at floor level has been built up to approxiamately 2 metres high. This is now the final layout of the ground floor, showing where toilets and stairways will be etc.

Thursday afternoon, and the high spec insulation is fixed to the block work.

Friday morning and the exterior brick work is now started.

   

THALL BRICK2

Rear toilet and shower area being insulated and then brick work laid.

THALL BRICK

Brick work showing side ground floor windows.

THALL BRICK3

By Friday 23rd March all block work has now been built upto the first floor height, which in the main hall is approxiamately 3metres. Exterior brick work is just short of this, but now gives a good indication of the final appearance of the building, showing windows and doorways at ground level.

Monday 26th March and the roofing joists were fitted in the rear shower block area.

   

thall march01

thall march02

This land is part of the rear out door area where we hope to have further training facilities.

thall march04

thall march05

thall march06

thall march07

Above are two veiws of inside downstairs hall area.

thall march08

thall march10

thall march09

thall march11

 

   

 

Img 1100A

Building completed to first floor level and now the two main steel girders are positioned to support the upstairs hall area. 

Img 1101A

Img 1103A

training hall easte2r

training hall easter3

David can't believe the size of the two steel girders.

training hall easter4

Once steels are in position, then the wooden joists were laid to bridge the steels for the upstairs floor.

training hall easter5

Block work, insulation and then outer brick-work progress for the upper floor.

training hall easter6

training hall easter7 


   

Img 1141A

Img 1142A

Img 1144A

Img 1145A

Img 1146A

Img 1148A

These veiws now give a better indication of the appearance of the new academy.

Img 1148A

Img 1150A

Brick-work now completed to roof level and timbers positioned to support roof.

Img 1151A

   

Img 1167a

Img 1168a

 

Img 1170a


Img 1169a

Img 1182web

Img 1183web

Img 1185web

Img 1190web

Img 1192web(1)

Img 1193web

Img 1195web

acad3


   

Img 1199web

Upstairs showing floor layed and insulation at roof.

 

Upper floor now plastered and first coat of paint.

Img 1200web

acad4

Ground floor area and ceilings just been plastered.

acad1

Outside of academy completed.

up1

Upper floor showing front windows, wooden dummy & Black sash gallery photos on wall

up2

Upper floor showing side windows, lion heads on wall & 2nd wooden dummy

up3

Upper floor showing back wall area

up4

Upper floor showing entrance door and weapons rack

down1

Downs stairs showing side wall and some of the punch bags, speed ball & floor to ceiling ball

down2

Down stairs showing front corner with boxing ring and more bags

down3

Down stairs showing back corner with punch bob and bags etc